Studying the Interplay between the Durations and Breakages of Continuous Integration Builds
(Replication Package)
Dataset:
Studied projects (project-level data) [40 KB]
Studied projects (quarter-level data) [152 KB]
Studied builds (build-level data) [47.2 MB]
Scripts:
RQ1
RQ2
RQ3
RQ4
Results:
RQ1 → detailed results of the project-level multinomial model
RQ2 → detailed results of the build-level multinomial model
RQ3 → detailed results of the build-level switching mixed-effects regression models
RQ4 → detailed results of quadrant switching patterns overtime
RQ4 → detailed results of within-project logistic regression models
Survey:
Participants Recruitment Letter